Installation Instructions
3.0 Unit Installation
Profile
3. UNIT INSTALLATION
3.1. Installing the Dropper Duct
All Celair Fresh Air Conditioners are designed to be fully supported by a metal
dropper duct. Metal dropper ducts must be designed, located and fixed to comply to
the relevant building codes. Plastic dropper ducts are not recommended for use.
Recommended Dropper Sizes
Model Dropper Duct
Size
PROFILE 500, 600, 750 550mm x 550mm
PROFILE 850 550mm x 800mm
Dropper Duct Height - Roof
Roof Pitch Clearance Height
17° 165 mm
22.5° 185mm
25° 195 mm
36° 240mm
3.1.1. Use the recommended dropper duct as advised above.
3.1.2. The dropper must be installed square and level.
3.1.3. It should not touch ceiling joists or other structural members that allow noise
and vibration to be transmitted into the building.
3.1.4. Ensure the dropper duct is installed so the unit does not touch the roof.
3.1.5. Fix the duct dropper to the roof structure so that it’s secure and vibration free.
3.1.6. All droppers must be fitted with a splitter pyramid in the base to ensure correct
airflow.
3.1.7. All ductwork, electrical cables, water pipes and drains must be fully flashed
and sealed to prevent the entry of water into the building.
3.1.8. Plastic dropper ducts should not be used as these may void warranty.