Installation Instructions
1.0 Introduction
Profile
1.2.3. Safety and O.H.&S. Requirements
It is the responsibility of the dealer / installer to insure the environment is
safe for the installer to carry out the installation. A risk assessment should
be carried out in conformance to state codes of practice. An industry guide
to “safe Work at Heights” is available from Climate Technologies.
It is the responsibility of the dealer / installer to ensure safe access to the
unit can be achieved for service and that the access conforms to the
relevant standards and codes.
It is the responsibility of the dealer / installer to ensure the roof is provided
with access footings and platform where the pitch of the roof is unsafe for
service access.
It is the responsibility of the dealer / installer to ensure harness anchorage
points are provided where units are located on a roof greater than single
story or if the pitch and roof construction do not allow safe access. See
Australian Standard 1891.4:2000 Part 4 Selection use and maintenance,
Table 2.1.
1.3. Before Commencing
Packaging – check there is no damage before removing packaging. Damaged
units should not be installed. Climate Technologies should be contacted prior to
installation.
Do not install damaged products. Contact your nearest Climate Technologies
office for further advice.
Installed damaged products will not be covered by warranty.
Have you got all the system components?
Have you got the right unit?
Does the system design conform to the minimum specification of Celres
specification and as such fall in line with sound engineering design practices.
Page 4