Installation Instructions
5.0 Commissioning
Profile
5.7. Commissioning Check List
You must complete, date and sign the ‘tick box’ checklist in the owner’s
manual. Use this copy to check the installation prior to completing the
owner’s documentation.
Unit
All equipment ordered by the customer is installed.
The unit is level and secure.
The water supply line has been flushed to clear swarf and debris and is
free of leaks.
The tank is free of foreign matter and debris and the water isolating tap
is turned ON.
Water drainpipe work is completed and sealed.
The water basin fills with water and the float valve closes correctly when
the water level is 30-35mm below the overflow level.
The water pump operates correctly when turned ON at the controller.
The dump valve cycle times and / or Dialflo water bleed rate are set to
suit local water conditions.
The Enviroflow Water Conservation System. The tank drains correctly
when unit turns off.
The fan deck is correctly located and the fan blade spins freely.
The mains and control wiring are complete and the circuit breaker and
GPO are turned ON.
The fan operates through the entire speed range.
The minimum fan speed is correctly set.
Water distribution is even with the filter pads fitted and the air
conditioner operating pump and fan.
All Controller functions for the appliance operate.
Page 22